RIX Industries Flow Downs
Prime Coded Note:
S028
Revision:
7/11/2017
Description:
First Article Inspection per AS9102. Rev. 06/06/2017
Clause:
Rev. 06/06/2017 Seller shall perform First Article Inspection (FAI) in accordance with AS9102, Aerospace First Article Inspection Requirement.Buyer reserves the right to conduct surveillance of the Seller’s FAI and may include in-process inspections to be accomplished during performance of the Seller’s FAI. When surveillance of the FAI is required, Seller will be notified by L3Harris Supplier Quality. Seller shall coordinate and schedule FAI activity with the Buyers Supplier Quality Representative (SQR) and Supply Chain Representative prior to start of related procurement, manufacturing and or processing.In the event the Buyer’s Supplier Quality Representative is to participate in the Seller’s FAI, supplier shall make the following available to the L3Harris SQR:Applicable purchase documentMaterial/process certificationsInspection records and inspection plans (to include item features, specifications, measurement results, measurement equipment used and calibration status)Applicable Design DataApplicable acceptance and qualification test resultsSeller will deliver with the initial shipment of the FAI item a copy of the First Article Inspection Report (FAIR)When a partial or re-accomplished FAI is performed as required by AS9102, Seller will deliver a copy of the FAIR with the shipment of the FAI item.Deliverable Report: When documenting the FAI, the Seller may use the forms contained within AS9102 or their equivalent, so long as the forms contain all the information required by AS9102.