RIX Industries Flow Downs

Prime Coded Note:

R010

Revision:

12/17/20

Description:

SHOCK TEST AND POST TEST REPORTS

Clause:

Coded Note Number: S2110
Revision: C015
Date: December 17, 2020

Title: SHOCK TEST AND POST TEST REPORTS

SHOCK REPORT SUBMITTAL:
This item requires high impact shock qualification in accordance with MIL‐S‐901D and
procurement Appendix L. The supplier is required to specify to the Newport News
Shipbuilding sourcing representative with their quote or no later than (1) month after
placement of this purchase order (if a request for quote is not generated), which of the
following means will be used to shock‐qualify this item:

A. Testing
B. Extension Request
C. Calculation/Analysis
D. Submit evidence of previous shock qualification approval for this item

A. If Shock Testing Will Be Used To Qualify This Item:
1. (7) Hard copies or (1) electronic copy of the shock test report, including the results
of the shock testing, post shock test inspection and any post shock test functional
testing, is required for each test performed in accordance with Appendix L. The
shock test report and post shock test report shall include all required information
specified in MIL‐S‐901D. The purchase order number, item number and vendor's
drawing number, if applicable, be indicated on the reports. Reports for approval
are required by the purchaser within (1) month after completion of the shock test.
2. Clear photographs of the test setup and each instance of damage must accompany
each shock test report.
3. Only standard test fixtures shown in MIL‐S‐901D or non‐standard fixtures approved
by the Navy prior to testing, will be accepted for the shock test.
The following will be considered as non-Standard fixture by Newport News:
Any fixture used that is not described in MIL-S-901D and defined as a standard
fixture; any alteration to the standard fixtures described in MIL-S-901D; the use of
any intermediate plate, bracket or fixture between the standard fixture and the test
item. Any of the above situations used separately or in combination is to be
considered non-standard, until evaluated by Newport News and the NAVSEA
technical authority on a case by case basis.
4. Certification of the shock test report for lightweight and medium weight shock tests
shall be by the facility performing the shock test. Certification of shock test report
for all heavy weight tests shall be by the government representative.
5. Certification of the post shock test inspection and functional testing report by the
government representative is required for tested components of all weight classes.
6. Unless a DCMA (formerly DCMC or DCAS) exemption code is listed on page (1) of this purchase order, Government Procurement Quality Assurance (GPQA) action is
required prior to shipment from your plant. Upon receipt of this order and/or any
subsequent modifications, please notify the government representative who
normally services your plant at least two weeks in advance of the time and place of
the test and the post shock test inspection and functional testing for all weight
classes. Promptly furnish a copy to the government representative who normally
services your plant or, if none, to the nearest Army, Air Force, or defense supply
agency inspection offices so that appropriate planning for government inspection
can be accomplished. In the event that the representative or office cannot be
located, our purchasing department should be notified immediately.
Your shipping document or packing list shall be used to indicate performance
of required GPQA action. The following statement of the government
representative shall be entered on all copies:

“Required PQA of listed items has been performed.
________________________ (Signature or DOD Stamp of Authorized Gov’t
Rep.)
________________________ (Date)
________________________ (Typed Name of Office).”

In no event shall any DCMA or other government inspection, approval or
acceptance be construed as inspection, approval or acceptance on behalf of
purchaser or to any way preclude purchaser from rejecting any item(s) that are
not in full compliance with all purchase order requirements, including, but not
limited to, timely delivery; unless otherwise expressly provided in this purchase
order, purchase acceptance shall be after receipt inspection by purchaser at
purchaser’s Newport News, VA premises.

B. If Shock Approval Extension Will Be Used To Shock Qualify This Item:
A shock extension package consisting of the following shall be submitted:
1. (7) Hard copies or (1) electronic copy of Navy Approval Letter, including Figure 19
and the shock test report for the item used as the basis for the extension.
2. Drawings of the tested and untested items.
3. Differences in the two items must be clearly identified and analyzed to show the
untested item has equal or better shock resistance. Detailed engineering rationale
and/or supporting calculations must be provided to demonstrate this.
If shock extension is not approved and shock testing will be required, the vendor is required to notify the Newport News Shipbuilding sourcing representative.

C. If Calculations/Analysis Are Used To Shock Qualify This Item:
1. If the item is to be 'Grade A' qualified, NAVSEA approval prior to analysis must be
granted. Please notify the Newport News Shipbuilding sourcing representative of
your intent to shock qualify the item using this method so NAVSEA approval is
received prior to proceeding.
2. The model to be used for analysis must be approved prior to beginning the analysis.
3. (7) Hard copies or (1) electronic copy of dynamic analysis calculations performed in
accordance with NAVSEA‐0908‐LP‐000‐3010, Rev 1, shall be submitted.
4. (7) Hard copies or (1) electronic copy of the report summarizing the calculations and
the results shall be submitted.

This requirement may be satisfied by one of the following methods.
D. If The Item Has Been Previously Shock Qualified:
Include clearly marked on the submittal:
a. This current purchase order/item number(s),
b. NN Material Number(s),
c. This coded note number,
d. The report number/revision.

In the event the scheduled date for submittal cannot be met, the supplier shall provide a
complete list of all documents and revisions to be used in advance of submittal. Full
compliance to this submittal requirement is expected.
NOTIFICATION OF (UNLISTED) APPROVED/PENDING APPROVAL REPORT(S):
If previous approval has been obtained from NNS OR the report has been submitted and is pending approval from NNS but the report number and revision is not listed on this purchase order/item, re‐submittal of the report is not required. Submit notification of the previous OR pending approval, including D. a. through d. above and the PO and item number of the previous submittal. For previously approved reports, also include the previous approval letter number/identification.

USE OF (LISTED) APPROVED REPORT(S):
If the report and revision used is listed on this purchase order/item, this requirement is
satisfied, the supplier is authorized to perform work and no submittal is required.
The above requirements do not relieve the seller of his responsibility to comply with the
specification requirements of the purchase order.
Documents/extensions shall be submitted as follows:
SPARS (Shipbuilding Partners and Suppliers) enabled suppliers are required to submit through https://spars.huntingtoningalls.com/ngcspars/Auth

All other suppliers shall submit via:
mail to:
Newport News Shipbuilding
4101 Washington Ave.
Newport News, VA 23607
Attn: E68 Software Coordinator
Bldg. 902‐2

The following link contains assistance in meeting the requirements of this coded note.
http://supplier.huntingtoningalls.com/sourcing/doc_submittal_checklists.html