RIX Industries Flow Downs
Prime Coded Note:
Q226
Revision:
1/19/2017
Description:
REQUESTED MATERIAL REVIEW BOARD
Clause:
Seller shall process nonconforming goods in accordance with the applicable method described below unless directed otherwise in the contract.1. Buyer designed goods without Buyer’s MRB delegation –Document and process nonconformance requiring Material Review Board (MRB) action in accordance with "Supplier Requested Material Review Board” instructions. These instructions can be found at the following URL:http://www.boeingsuppliers.com/supplier_portal/bdsSiteReqs.html2. Seller designed goods (Seller Drawing, Buyer’s Source or Specification Control Drawing) –Document and process nonconformance in accordance with Seller's quality system procedures. If any Buyer’s Source or Specification Control Drawing characteristic is nonconforming, it must be processed in accordance with requirement 1, above.3. Buyer designed goods with MRB delegation –Document and process nonconformance requiring Material Review Board (MRB) action in accordance with the Buyer letter of delegation for Material Review and Seller's quality system procedures.
