RIX Industries Flow Downs
Prime Coded Note:
Q094
Revision:
8/2/2018
Description:
CONDITIONAL RELEASE TO MANUFACTURE / WORK RELEASED
Clause:
1. Based upon all required Pre-Production Vendor Technical Documents (VTD) having been previously furnished to and approved by NNS, Manufacturing Authorization is hereby granted. Changes/revisions to the applicable Pre-Production VTD shall be approved by NNS prior to use in manufacturing as specified in the applicable coded notes.1.1. Note 1. Any work performed in accordance with Pre-Production VTD that has not been previously approved by NNS shall be at the manufacturer's own risk.1.2.Note 2. If a welding and/or brazing procedure submittal coded note is invoked, applicable welding and/or brazing procedures shall be approved by NNS prior to use in manufacturing.Revision History Table Rev Description Revision Date C005 ADDED: 1. Paragraph numbers added; coded note number and page number added to footer of each page. REASON: Change to new iDS format. REVISED: 2. Removed every occurrence of previous revision control ([Text deleted] and bold text). REASON: Change in method of showing Coded Note revisions; 6/26/2018 C006 Changed to correct formatting issues. Removed: 1. Footer removed from each page. 7/19/2018 C007 Removed: Return(s) (blank line(s)) following revision history note after table removed to allow SAP ZIPM functionality. 8/2/2018
