RIX Industries Flow Downs

Prime Coded Note:

Q086

Revision:

7/11/2017

Description:

Tooling Control - Supplier shall establish and maintain a system to ensure that all tooling used for mfg and acceptance is inspected, protected, and otherwise controlled…(Rev. 06/01/2020)

Clause:

Acceptance of production tooling against this Purchase Order shall be contingent upon inspection andacceptance by L3Harris, of the applicable characteristics. Dimensional samples, quantity designated byPurchase Order, produced by this tooling must conform to tolerance limits of drawings and specificationsspecified by this Purchase Order. When duplicate tools are made to the same tool number, each must beproofed separately. Any rework of a tool after proofing (beyond its normal maintenance) shall requiresubsequent proofing and approval by L3Harris Seller shall maintain process records for molded parts,including mold release agents used, temperature, pressure, and time cycle data for preheat molding andcure, as applicable.A. Tool proofing acceptance shall be under surveillance of the cognizant L3Harris quality representativeat the Seller’s facility. Seller shall furnish a legible and reproducible copy of tool proofing approvalwith the initial shipment. Approval shall list the tool number and inspection variables data, signed orstamped and dated by the L3Harris quality representative, orB. Items produced by production tooling may be shipped to L3Harris for acceptance inspection, in whichcase dimensional samples must be identified with the tool number, tool serial number and, whenapplicable, the individual cavity number.