RIX Industries Flow Downs

Prime Coded Note:

Q051

Revision:

7/11/2017

Description:

FACTORY/QUALITY ASSURANCE ACCEPTANCE TEST PROCEDURES AND DATA Rev. 6/1/2020

Clause:

0 FACTORY/QUALITY ASSURANCE ACCEPTANCE TEST PROCEDURES AND DATAA. Proposed Factory/Quality Assurance Acceptance Test Procedures shall be submitted to L3Harris, forapproval, 30 days prior to conducting the tests. The procedure format shall include the parameters tobe measured, step by step method of test, test equipment required, and provisions for recordingresults in such a manner as to permit recording of each required performance characteristic in a clearand concise form. When these procedures make reference to test fixtures for acceptance testing, acopy of the schematic of the fixtures shall be supplied.B. Factory/Quality Assurance Acceptance Test Procedures and the actual test data recorded duringacceptance testing shall be provided with each item/equipment delivered at the time of delivery of theequipment. One hundred percent (100%) of the items delivered shall be tested.